eceee
Ece_ISS12_CPF_801AD.gif 

 RSS Feed

Buy Summer Study proceedings

Proceedings.gif

Lot 26: Networked standby losses of energy using products

Consultation Forum for this product group was held 14 September 2011.

During the discussion in Consultation Forum, the following items were agreed:

  • The scope of this lot will not be reviewed.
  • A definition of High Network Availability product groups
    should be further discussed and refined.
  • The requirements for Power Management should be reviewed. In particular
    the question of when networked products will need to comply with the
    requirements in the standby regulation in force (1275/2008, Lot 6).
  • Consumers concerns will be looked upon again.
  • The power limits and time frame should be further discussed.

Comments should be submitted to the Commission before 14 December 2011.

Date

Process

Key documents

14 Sept 2011
Consultation Forum

Products topology (pdf)

Working document (pdf)
List of participants (pdf)

Presentation (pdf)

Minutes (pdf)

 

Comments:

Member States:

SE (doc)

BE (doc)

 

Env & NGOs:

ECOS (pdf)

ANEC-BEUC (pdf)

24 June 2011 Final report published Final report (zip)
Comments DK (pdf)
Comments CECED (pdf)
Comments DIGITAL EUROPE (pdf)
16 Dec 2010
Draft final report published
documents section
Oct 2010
Draft final report

June 2009 Project launch www.ecostandby.org

 

Products & status

European Directives:
Dedicated pages
and policy briefs

Directives.gif