Study of Amended Ecodesign Working Plan
The outcome of this study was discussed in Consultation Forum on 20 January 2012. A Communication on the new Working Plan has been submitted and expected date for adoption of the new plan is 18 April 2012.
The Ecodesign Working Plan sets out an indicative list of product groups that are considered as priorities for the adoption of implementing measures. The Commission can revise work plans periodically after consultation with the Consultation Forum.
The Working Plan covering 2009-2011 was published in October 2008 and will be replaced by a Working Plan for 2012-2014.
The criteria for products to be covered are:
- The product group represents a significant volume of sales and trade within the Community;
- The product group has a significant environmental impact within the Community resulting from the energy-using products during their life cycle;
- The product group presents significant potential for improvement in terms of its environmental impact without entailing excessive costs.
A new study provides background information and analysis for the establishment of a plan for the following three years (2012-2014).
The study of the Amended Ecodesign Working Plan started in November 2010 and lists priorities and address the need for revising the methodology of the Ecodesign directive in order to cover more (also energy-related) products.
|
Date
|
Process
|
Key documents
|
| 18 April 2012 |
Adoption expected |
|
| March 2012 |
Submission to DG Translation |
|
| 20 Jan 2012 |
Launch of Inter-Service Consultation (ISC) |
|
| 20 Jan 2012 |
|
|
Consultation Forum. Discussion of the outcome of the Working plan study and the Methodology study.
|
|
|
|
|
Presentation status (ppt)
Presentation draft working plan (ppt)
Minutes (doc)
Comments:
Summary stakeholder feed back (doc)
NGO and Consumers:
ECOS: (doc)
Member States:
SE (pdf) UK (pdf) DK (docx)
|
| Jan 2012 |
|
Final report: task 1-2 (pdf),annex 5 (pdf), task 3 (pdf), task 4 (pdf)
Meeting minutes 16 Dec (pdf)
|
| Dec 2011 |
|
Communication on Working Plan (doc)
|
| 16 Sept 2011 |
2nd stakeholder meeting |
|
| July –August 2011 |
|
Main report task 1-3 (pdf) Draft report task 4 (pdf)
Summary task 4 (pdf)
Documents section
|
| 14 July 2011 |
Draft report task 1-3 available |
|
April 2011
|
Stakeholder consultation |
|
11 March 2011
|
1st stakeholder meeting |
minutes (pdf) presentation morning (pdf) presentation afternoon (pdf)
|
Nov 2010
|
Launch of the Amended Ecodesign Working Plan Background Study |
Study web site
|
Products & status