![]() | |||
Persistence of Benefits from New Building CommissioningHannah Friedman, Amanda Potter, and Tudi Haasl, Portland Energy Conservation, Inc. KeywordsAbstractThe commissioning process is gaining increasing recognition as a cost-effective strategy for reducing commercial building energy use. Although the success and costeffectiveness of commissioning activities depend on how well the benefits of commissioning persist over time, this aspect of commissioning is not well understood. The persistence of the benefits of commissioning new construction was recently studied as a part of the California Energy Commission Public Interest Energy Research program. Ten buildings that were commissioned as new buildings at least two years ago were evaluated. The commissioning reports, control algorithms, EMCS point measurements, and energy use data were examined to determine the persistence of selected items that were fixed during commissioning. Operator, owner, and commissioning provider interviews were conducted to help determine reasons for persistence and methods of improving persistence. The majority of the commissioning fixes that were studied persisted. The items that did not persist were typically changes in occupancy scheduling and cooling plant control strategies. The persistence of commissioning benefits was found to be highly dependent on the working environment for building engineers and maintenance staff. Through this investigation, we identified three main reasons that benefits of commissioning did not persist: limited operator support and high operator turnover rates, poor information transfer from the commissioning process, and a lack of systems put in place to help operators track performance. Four methods for improving persistence are proposed, focusing on operator training and system documentation. PaperDownload this paper as pdf: 11_304.pdf Panels of the 2002 ACEEE Summer Study on Energy Efficiency in BuildingsPanel 2. Residential Buildings: Program Design and Implementation Panel 4. Commercial Buildings: Program Design and Implementation Panel 6. Market Transformation Panel 7. Information and Electronic Technologies: Promises and Pitfalls Panel 8. Human and Social Dimensions of Energy Use: Understanding Markets and Demand | CalendarCall for papers deadline - eceee 2012 Industry Summer Study 28 Feb – 02 Mar 2012World Sustainable Energy Days 2012 29 Feb – 02 Mar 2012Australia's first energy efficiency summer study 01 – 02 Mar 2012WSED - Energy Efficiency Watch: Nearly zero energy buildings 22 – 24 Mar 2012Workshop on energy & society 28 – 30 Mar 20128th South-East European Congress & Exhibition on Energy Efficiency and Renewable Energy 28 – 30 Mar 2012South-East European Conference & Exhibition "SAVE the Planet" - Waste Management & Recycling, Environment |