Building Automation and Control Systems (BACS)
The first part of the preparatory study for this product group started in October 2017. The scoping study report was finalized by the end July 20, 2018.
A kick-off meeting for the full preparatory study was held on July 11, 2019. The study will run until end of 2020.
The primary aim of the first part of the study is to define the product scope, to identify the focus areas & direction to take for the subsequent preparatory study and ultimately determine and to draft out policy options.
Date | Process | Key documents |
---|---|---|
Preparatoty study | ||
Study launch | Part of study launced |