Ecodesign status: Coming products

Labelling status: Study ongoing

Building Automation and Control Systems (BACS)

Last updated:

Building Automation and Control Systems (BACS)

The first part of the preparatory study for this product group started in October 2017. The scoping study report is expected to be finalized by the end June 2018.

The start of full preparatory study(ies) on BACS is expected in August 2018.

The primary aim of the first part of the study is to define the product scope, to identify the focus areas & direction to take for the subsequent preparatory study and ultimately determine and to draft out policy options.

Date Process Key documents
2017-10 Study launch

Part of study launced